#TITLE_ALTERNATIVE#
A project can be divided into smaller works with dependencies among those works. The Critical Path Method (CPM) has been widely used to obtain a project schedule which has the earliest finish time in order to minimize the cost.<p> <br /> <br /> <br /> However, CPM which only...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/10469 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:10469 |
---|---|
spelling |
id-itb.:104692017-09-27T11:43:04Z#TITLE_ALTERNATIVE# (NIM 10103060), FREDDY Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/10469 A project can be divided into smaller works with dependencies among those works. The Critical Path Method (CPM) has been widely used to obtain a project schedule which has the earliest finish time in order to minimize the cost.<p> <br /> <br /> <br /> However, CPM which only calculates two factors, i.e. work duration and work dependencies, is no longer sufficient nowadays. In a particular project, it may happen that two or more works are handled only by one resource at the same time (this event would then be called the R factor). Additionally, there might be ineffective interval periods between two or more works that are handled by a particular resource.<p> <br /> <br /> <br /> This Final Project gives explanation about CPM concerning the R factor, this method will be further called CPMR. We will discuss the definition of CPMR, the steps inside CPMR, the algorithm of CPMR, and an example of application of CPMR. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
A project can be divided into smaller works with dependencies among those works. The Critical Path Method (CPM) has been widely used to obtain a project schedule which has the earliest finish time in order to minimize the cost.<p> <br />
<br />
<br />
However, CPM which only calculates two factors, i.e. work duration and work dependencies, is no longer sufficient nowadays. In a particular project, it may happen that two or more works are handled only by one resource at the same time (this event would then be called the R factor). Additionally, there might be ineffective interval periods between two or more works that are handled by a particular resource.<p> <br />
<br />
<br />
This Final Project gives explanation about CPM concerning the R factor, this method will be further called CPMR. We will discuss the definition of CPMR, the steps inside CPMR, the algorithm of CPMR, and an example of application of CPMR. |
format |
Final Project |
author |
(NIM 10103060), FREDDY |
spellingShingle |
(NIM 10103060), FREDDY #TITLE_ALTERNATIVE# |
author_facet |
(NIM 10103060), FREDDY |
author_sort |
(NIM 10103060), FREDDY |
title |
#TITLE_ALTERNATIVE# |
title_short |
#TITLE_ALTERNATIVE# |
title_full |
#TITLE_ALTERNATIVE# |
title_fullStr |
#TITLE_ALTERNATIVE# |
title_full_unstemmed |
#TITLE_ALTERNATIVE# |
title_sort |
#title_alternative# |
url |
https://digilib.itb.ac.id/gdl/view/10469 |
_version_ |
1820664983098228736 |