#TITLE_ALTERNATIVE#
In utilizing effort the geothermal energy to be electric energy optimally, modification of the standard thermodynamic cycle is one of the important alternative solution may be conducted. Combination between a gas turbine cycle and a Rankine cycle implemented in a geothermal power plant with any modi...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/10745 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!