#TITLE_ALTERNATIVE#
Any development plan of oil and gas field will face uncertainty in determining reserve and optimum reservoir production scenario. Therefore, a study for determining reservoir performance under several parameter sensitivities is necessary to be conducted.<p>This study was conducted in order to...
Saved in:
Main Author: | YAHYA (NIM 12203025), MUSYOFFI |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/11015 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: YAHYA (NIM 13204237), ISA -
#TITLE_ALTERNATIVE#
by: ARIEF YAHYA (NIM 10202032), ADITYA -
#TITLE_ALTERNATIVE#
by: JUWITO YAHYA (NIM 13503085), ALDO -
#TITLE_ALTERNATIVE#
by: YAHYA, ARFASYAD -
#TITLE_ALTERNATIVE#
by: MAULANA (NIM12306009) pembimbing : Dr. Hendra Grandis, YAHYA