#TITLE_ALTERNATIVE#
Master Production Schedule (MPS) translate the sales and operation plans of the company into a plan for producing specific product in the future.<p> <br /> <br /> <br /> On a day-to-day basis, the MPS provide the information by which sales and manufacturing are coordinated....
Saved in:
Main Author: | RISWANDI (NIM 13105604), RIDWAN |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/11276 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: (NIM 13503072), RIDWAN -
#TITLE_ALTERNATIVE#
by: RIDWAN (NIM 26989006), IWAN -
#TITLE_ALTERNATIVE#
by: MUHAMMAD RIDWAN (NIM 13102076), ARIS -
#TITLE_ALTERNATIVE#
by: RIDWAN ARFANI (NIM 10103068), TAUFIK -
#TITLE_ALTERNATIVE#
by: P. SIDIK (NIM 12004046), RIDWAN