THE ANALYSIS OF PROJECT COMPLETION DELAY ALONG WITH THE RECOMMENDATION OF THE SYSTEM AND PROCEDURE TO HANDLE IT AT PT. Z (CASE STUDY: CRUSHER MASTER PLAN PROJECT)
PT Z did the expansion at Crusher Plant with 49.7 million dollar US Cost. The Expansion was aimed to anticipate the incremental production increase at Grasberg Open Pit Mine in 2008, 2013 and 2014 due to high cut-off grades and also from U/G mine that increase its production to be 80 thousand tons p...
Saved in:
Main Author: | ULYA HIDAYAT (NIM: 29107144), AKHMAD |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/11772 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
OPERATIONAL RISK MANAGEMENT AT CRUSHER MASTER PLAN PROJECT PT FREEPORT INDONESIA
by: NUGROHO (NIM : 29107127); Pembimbing: Ir. RUDY BEKTI, MM, SETIA -
RECOMMENDATIONS FOR EFFECTIVELY COMPLETING PROJECT MAPLE PARK APARTMENT
by: NARULITA (NIM : 29106423); Pembimbing: Ir. Rudy Bekti, MM, TITA -
A master filmmaker handles a masterwork
by: Del Mundo, Clodualdo A., Jr.
Published: (2003) -
Improving postharvest handling of the Royal Project vegetables
by: P. Poonlarp, et al.
Published: (2018) -
Improving postharvest handling of the Royal Project vegetables
by: P. Poonlarp, et al.
Published: (2018)