THE ANALYSIS OF PROJECT COMPLETION DELAY ALONG WITH THE RECOMMENDATION OF THE SYSTEM AND PROCEDURE TO HANDLE IT AT PT. Z (CASE STUDY: CRUSHER MASTER PLAN PROJECT)

PT Z did the expansion at Crusher Plant with 49.7 million dollar US Cost. The Expansion was aimed to anticipate the incremental production increase at Grasberg Open Pit Mine in 2008, 2013 and 2014 due to high cut-off grades and also from U/G mine that increase its production to be 80 thousand tons p...