#TITLE_ALTERNATIVE#
Collaboration involving companies becomes an alternative to minimize cost and improve the flexibility. Multi-plant assembly planning is one of colaborative processes. Components or sub-assemblies may be distributed, produced and assembled at various plants, so evaluation of assembly location has bec...
Saved in:
Main Author: | HARUN ISMAIL (NIM : 23406024), ASRUL |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/11886 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: SIDIQ (NIM : 15406105); , ASRUL -
#TITLE_ALTERNATIVE#
by: AL RASYID (NIM 29106053), HARUN -
#TITLE_ALTERNATIVE#
by: KIMSAN (NIM : 15001069); ASRUL AHDAR (NIM : 15001090); Pembimbing : Prof. Ir. Amrinsyah Nas, MASYKUR -
#TITLE_ALTERNATIVE#
by: Rahman Harun (NIM 207 93 010), Fathur -
#TITLE_ALTERNATIVE#
by: HASBULLAH (NIM 10103010), ISMAIL