STUDY ON RISK MANAGEMENT PROJECT DEVELOPMENT OF ELECTRICITY TRANSMISSION NETWORK

Risk management is the process to gain insight about the risks of a development project which includes the general risk identifiers, classification, analysis, and measurement of risk and treatment efforts. This research uses case studies of development projects of electricity transmission network T/...

Full description

Saved in:
Bibliographic Details
Main Author: YUNAS (NIM: 23207318), FAUZAN
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/12110
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:12110
spelling id-itb.:121102017-09-27T15:37:39ZSTUDY ON RISK MANAGEMENT PROJECT DEVELOPMENT OF ELECTRICITY TRANSMISSION NETWORK YUNAS (NIM: 23207318), FAUZAN Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/12110 Risk management is the process to gain insight about the risks of a development project which includes the general risk identifiers, classification, analysis, and measurement of risk and treatment efforts. This research uses case studies of development projects of electricity transmission network T/L 150 kV Bangko-Hydropower (PLTA) Merangin-Sungai Penuh. And the results of measurements or rankings show risk assessment/risk level of the activities of land acquisition for tower site acquisition and employment grow crops for Right of Way (ROW) are solely the responsibility of PLN. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Risk management is the process to gain insight about the risks of a development project which includes the general risk identifiers, classification, analysis, and measurement of risk and treatment efforts. This research uses case studies of development projects of electricity transmission network T/L 150 kV Bangko-Hydropower (PLTA) Merangin-Sungai Penuh. And the results of measurements or rankings show risk assessment/risk level of the activities of land acquisition for tower site acquisition and employment grow crops for Right of Way (ROW) are solely the responsibility of PLN.
format Theses
author YUNAS (NIM: 23207318), FAUZAN
spellingShingle YUNAS (NIM: 23207318), FAUZAN
STUDY ON RISK MANAGEMENT PROJECT DEVELOPMENT OF ELECTRICITY TRANSMISSION NETWORK
author_facet YUNAS (NIM: 23207318), FAUZAN
author_sort YUNAS (NIM: 23207318), FAUZAN
title STUDY ON RISK MANAGEMENT PROJECT DEVELOPMENT OF ELECTRICITY TRANSMISSION NETWORK
title_short STUDY ON RISK MANAGEMENT PROJECT DEVELOPMENT OF ELECTRICITY TRANSMISSION NETWORK
title_full STUDY ON RISK MANAGEMENT PROJECT DEVELOPMENT OF ELECTRICITY TRANSMISSION NETWORK
title_fullStr STUDY ON RISK MANAGEMENT PROJECT DEVELOPMENT OF ELECTRICITY TRANSMISSION NETWORK
title_full_unstemmed STUDY ON RISK MANAGEMENT PROJECT DEVELOPMENT OF ELECTRICITY TRANSMISSION NETWORK
title_sort study on risk management project development of electricity transmission network
url https://digilib.itb.ac.id/gdl/view/12110
_version_ 1820728415676792832