STUDY ON RISK MANAGEMENT PROJECT DEVELOPMENT OF ELECTRICITY TRANSMISSION NETWORK
Risk management is the process to gain insight about the risks of a development project which includes the general risk identifiers, classification, analysis, and measurement of risk and treatment efforts. This research uses case studies of development projects of electricity transmission network T/...
Saved in:
Main Author: | |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/12110 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:12110 |
---|---|
spelling |
id-itb.:121102017-09-27T15:37:39ZSTUDY ON RISK MANAGEMENT PROJECT DEVELOPMENT OF ELECTRICITY TRANSMISSION NETWORK YUNAS (NIM: 23207318), FAUZAN Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/12110 Risk management is the process to gain insight about the risks of a development project which includes the general risk identifiers, classification, analysis, and measurement of risk and treatment efforts. This research uses case studies of development projects of electricity transmission network T/L 150 kV Bangko-Hydropower (PLTA) Merangin-Sungai Penuh. And the results of measurements or rankings show risk assessment/risk level of the activities of land acquisition for tower site acquisition and employment grow crops for Right of Way (ROW) are solely the responsibility of PLN. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Risk management is the process to gain insight about the risks of a development project which includes the general risk identifiers, classification, analysis, and measurement of risk and treatment efforts. This research uses case studies of development projects of electricity transmission network T/L 150 kV Bangko-Hydropower (PLTA) Merangin-Sungai Penuh. And the results of measurements or rankings show risk assessment/risk level of the activities of land acquisition for tower site acquisition and employment grow crops for Right of Way (ROW) are solely the responsibility of PLN. |
format |
Theses |
author |
YUNAS (NIM: 23207318), FAUZAN |
spellingShingle |
YUNAS (NIM: 23207318), FAUZAN STUDY ON RISK MANAGEMENT PROJECT DEVELOPMENT OF ELECTRICITY TRANSMISSION NETWORK |
author_facet |
YUNAS (NIM: 23207318), FAUZAN |
author_sort |
YUNAS (NIM: 23207318), FAUZAN |
title |
STUDY ON RISK MANAGEMENT PROJECT DEVELOPMENT OF ELECTRICITY TRANSMISSION NETWORK |
title_short |
STUDY ON RISK MANAGEMENT PROJECT DEVELOPMENT OF ELECTRICITY TRANSMISSION NETWORK |
title_full |
STUDY ON RISK MANAGEMENT PROJECT DEVELOPMENT OF ELECTRICITY TRANSMISSION NETWORK |
title_fullStr |
STUDY ON RISK MANAGEMENT PROJECT DEVELOPMENT OF ELECTRICITY TRANSMISSION NETWORK |
title_full_unstemmed |
STUDY ON RISK MANAGEMENT PROJECT DEVELOPMENT OF ELECTRICITY TRANSMISSION NETWORK |
title_sort |
study on risk management project development of electricity transmission network |
url |
https://digilib.itb.ac.id/gdl/view/12110 |
_version_ |
1820728415676792832 |