#TITLE_ALTERNATIVE#
Indonesia has a great hydro power potency to develop in micro or mini and also big scale hydro power. But to develop hydro power requiring complicated studies and high expense, also the condition of Indonesia nature is complicating in location survey become resistance developing of small scale power...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/12268 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Indonesia has a great hydro power potency to develop in micro or mini and also big scale hydro power. But to develop hydro power requiring complicated studies and high expense, also the condition of Indonesia nature is complicating in location survey become resistance developing of small scale power hydro. In this final project explained an approach method in investment potency analysis in hydro power developing to take a short cut planning expense and time. This method enable one can analyses potency of water source with minim field data even without data measurement of field. This method is studying case example of Cisadane river stream in West Java in potency study of low head high discharge mini hydro power. Cisadane River at measurement point of flow in Batubeulah estimated can be exploited as power station equal to 16.421 KW. In one area of flow measurement then taken one point which has the biggest power potency to analyze in furthermore. Advanced analysis is selecting alternative of turbine design and eligibility analysis of investment. |
---|