#TITLE_ALTERNATIVE#

Indonesia has a great hydro power potency to develop in micro or mini and also big scale hydro power. But to develop hydro power requiring complicated studies and high expense, also the condition of Indonesia nature is complicating in location survey become resistance developing of small scale power...

Full description

Saved in:
Bibliographic Details
Main Author: WAHYU KUSUMO (NIM : 13204092), IRWANTO
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/12268
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:12268
spelling id-itb.:122682017-09-27T10:18:37Z#TITLE_ALTERNATIVE# WAHYU KUSUMO (NIM : 13204092), IRWANTO Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/12268 Indonesia has a great hydro power potency to develop in micro or mini and also big scale hydro power. But to develop hydro power requiring complicated studies and high expense, also the condition of Indonesia nature is complicating in location survey become resistance developing of small scale power hydro. In this final project explained an approach method in investment potency analysis in hydro power developing to take a short cut planning expense and time. This method enable one can analyses potency of water source with minim field data even without data measurement of field. This method is studying case example of Cisadane river stream in West Java in potency study of low head high discharge mini hydro power. Cisadane River at measurement point of flow in Batubeulah estimated can be exploited as power station equal to 16.421 KW. In one area of flow measurement then taken one point which has the biggest power potency to analyze in furthermore. Advanced analysis is selecting alternative of turbine design and eligibility analysis of investment. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Indonesia has a great hydro power potency to develop in micro or mini and also big scale hydro power. But to develop hydro power requiring complicated studies and high expense, also the condition of Indonesia nature is complicating in location survey become resistance developing of small scale power hydro. In this final project explained an approach method in investment potency analysis in hydro power developing to take a short cut planning expense and time. This method enable one can analyses potency of water source with minim field data even without data measurement of field. This method is studying case example of Cisadane river stream in West Java in potency study of low head high discharge mini hydro power. Cisadane River at measurement point of flow in Batubeulah estimated can be exploited as power station equal to 16.421 KW. In one area of flow measurement then taken one point which has the biggest power potency to analyze in furthermore. Advanced analysis is selecting alternative of turbine design and eligibility analysis of investment.
format Final Project
author WAHYU KUSUMO (NIM : 13204092), IRWANTO
spellingShingle WAHYU KUSUMO (NIM : 13204092), IRWANTO
#TITLE_ALTERNATIVE#
author_facet WAHYU KUSUMO (NIM : 13204092), IRWANTO
author_sort WAHYU KUSUMO (NIM : 13204092), IRWANTO
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/12268
_version_ 1820728468842741760