#TITLE_ALTERNATIVE#

If contingency happened both in the line and generators, power flow in the system will be changed. It causes the rescheduling of generators to maintain the minimum operation cost. The generator cost when contingency happened usually higher than normal condition. Because of that, there is difference...

Full description

Saved in:
Bibliographic Details
Main Author: FAHRUR ROZI (NIM 13204222), M.
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/12377
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:12377
spelling id-itb.:123772017-09-27T10:18:36Z#TITLE_ALTERNATIVE# FAHRUR ROZI (NIM 13204222), M. Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/12377 If contingency happened both in the line and generators, power flow in the system will be changed. It causes the rescheduling of generators to maintain the minimum operation cost. The generator cost when contingency happened usually higher than normal condition. Because of that, there is difference generation cost. Based on the difference generation cost and multiply it with the probability the system work, the security cost can be calculated. Security cost is the additional cost that must be prepared if there is contingency. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description If contingency happened both in the line and generators, power flow in the system will be changed. It causes the rescheduling of generators to maintain the minimum operation cost. The generator cost when contingency happened usually higher than normal condition. Because of that, there is difference generation cost. Based on the difference generation cost and multiply it with the probability the system work, the security cost can be calculated. Security cost is the additional cost that must be prepared if there is contingency.
format Final Project
author FAHRUR ROZI (NIM 13204222), M.
spellingShingle FAHRUR ROZI (NIM 13204222), M.
#TITLE_ALTERNATIVE#
author_facet FAHRUR ROZI (NIM 13204222), M.
author_sort FAHRUR ROZI (NIM 13204222), M.
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/12377
_version_ 1820728501978791936