#TITLE_ALTERNATIVE#
If contingency happened both in the line and generators, power flow in the system will be changed. It causes the rescheduling of generators to maintain the minimum operation cost. The generator cost when contingency happened usually higher than normal condition. Because of that, there is difference...
Saved in:
Main Author: | FAHRUR ROZI (NIM 13204222), M. |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/12377 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: SPARTA (NIM 15404079), ROZI -
#TITLE_ALTERNATIVE#
by: ROZI (NIM 151 05 074), FAKHRUL -
#TITLE_ALTERNATIVE#
by: FAKHRUL ROZI (NIM 102 01 067); Pembimbing : Dr.rer.nat.Bobby Eka Gunara, M. -
EFEKTIVITAS KOMBINASI PURSED LIP BREATHING DAN
DISTRACTIVE AUDITORY STIMULI TERHADAP PERSEPSI DYSPNEA DAN PEAK EKSPIRATORY FLOW PADA KLIEN PPOK DI RSUD JOMBANG
(Pendekatan Teori Self Care Dorothea Orem)
by: FAHRUR ROZI, NIM.: 131614153057
Published: (2018) -
#TITLE_ALTERNATIVE#
by: Hasan (NIM 20595509), M.