#TITLE_ALTERNATIVE#

The research was done at DOZ ramp A X/CUT 6, underground mine owned by PT. XYZ in Mimika, Papua province. The aims of this research were to observe the geological condition of the field, determine the propagation velocity of fracturing zone as well as investigate the correlation of the propagation v...

Full description

Saved in:
Bibliographic Details
Main Author: LUHANSA (NIM 121 04 077), RONNY
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/12609
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items