PENERAPAN PROGRAMA LINIER PADA OPTIMASI PRODUKSI BETON READY MIX

Making concrete mixture with high quality in the filed is difficult, because many factors influence the process and lack of quality control. Projects which need a lot of concrete in their constructions are considered inefficient in mixing the concrete on the site. Further more it is difficult to con...

Full description

Saved in:
Bibliographic Details
Main Author: Subiyanto, Agus
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/1262
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:1262
spelling id-itb.:12622004-12-08T10:45:21ZPENERAPAN PROGRAMA LINIER PADA OPTIMASI PRODUKSI BETON READY MIX Subiyanto, Agus Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/1262 Making concrete mixture with high quality in the filed is difficult, because many factors influence the process and lack of quality control. Projects which need a lot of concrete in their constructions are considered inefficient in mixing the concrete on the site. Further more it is difficult to control the quality. Ready mix concrete made in a factory with tight quality control is an alternative to solve the above problem. This thesis discusses a case study of optimization of ready mix concrete production and application by observing the need of ready mix concrete of each distribution area, capacity of each batching plant, and transportation cost from each plant to every distribution area by offering competitive rate by using linear program method. From the result of the case study of optimization of ready mix concrete production, it can be seen that the total production cost for a certain region, is determined by production cost and transportation cost to the region. Although production cost is more expensive and resulted in the high price of the concrete mixture, the total of production cost and transportation cost determine where the optimum region should be supplied by the ready mix concrete. The mathematical model of this ready mix concrete cost production can be used by ready mix concrete factory in preparing its cost production by using optimum sale forecasting to be able to determine the amount of quality concrete appropriate with the distribution area needed; so that production cost and competitive rate could be obtained. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Making concrete mixture with high quality in the filed is difficult, because many factors influence the process and lack of quality control. Projects which need a lot of concrete in their constructions are considered inefficient in mixing the concrete on the site. Further more it is difficult to control the quality. Ready mix concrete made in a factory with tight quality control is an alternative to solve the above problem. This thesis discusses a case study of optimization of ready mix concrete production and application by observing the need of ready mix concrete of each distribution area, capacity of each batching plant, and transportation cost from each plant to every distribution area by offering competitive rate by using linear program method. From the result of the case study of optimization of ready mix concrete production, it can be seen that the total production cost for a certain region, is determined by production cost and transportation cost to the region. Although production cost is more expensive and resulted in the high price of the concrete mixture, the total of production cost and transportation cost determine where the optimum region should be supplied by the ready mix concrete. The mathematical model of this ready mix concrete cost production can be used by ready mix concrete factory in preparing its cost production by using optimum sale forecasting to be able to determine the amount of quality concrete appropriate with the distribution area needed; so that production cost and competitive rate could be obtained.
format Theses
author Subiyanto, Agus
spellingShingle Subiyanto, Agus
PENERAPAN PROGRAMA LINIER PADA OPTIMASI PRODUKSI BETON READY MIX
author_facet Subiyanto, Agus
author_sort Subiyanto, Agus
title PENERAPAN PROGRAMA LINIER PADA OPTIMASI PRODUKSI BETON READY MIX
title_short PENERAPAN PROGRAMA LINIER PADA OPTIMASI PRODUKSI BETON READY MIX
title_full PENERAPAN PROGRAMA LINIER PADA OPTIMASI PRODUKSI BETON READY MIX
title_fullStr PENERAPAN PROGRAMA LINIER PADA OPTIMASI PRODUKSI BETON READY MIX
title_full_unstemmed PENERAPAN PROGRAMA LINIER PADA OPTIMASI PRODUKSI BETON READY MIX
title_sort penerapan programa linier pada optimasi produksi beton ready mix
url https://digilib.itb.ac.id/gdl/view/1262
_version_ 1820662912117637120