#TITLE_ALTERNATIVE#

A tank autonomous mobile robot will be built in this final project. This robot will be implemented to explore labyrinth.<p>The tank robot which used differential steering method can move forward, backward, and rotating. This robot is expected to be a platform which can integrate sensor, actuat...

Full description

Saved in:
Bibliographic Details
Main Author: RICKY (NIM 13205030), VINCENTIUS
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/12749
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:12749
spelling id-itb.:127492017-09-27T10:18:45Z#TITLE_ALTERNATIVE# RICKY (NIM 13205030), VINCENTIUS Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/12749 A tank autonomous mobile robot will be built in this final project. This robot will be implemented to explore labyrinth.<p>The tank robot which used differential steering method can move forward, backward, and rotating. This robot is expected to be a platform which can integrate sensor, actuator, and controller module to perform a mission. The robot is also equipped by software which can do localization and mapping. Topological Simultaneous Localization and Mapping (TSLAM) method will be used. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description A tank autonomous mobile robot will be built in this final project. This robot will be implemented to explore labyrinth.<p>The tank robot which used differential steering method can move forward, backward, and rotating. This robot is expected to be a platform which can integrate sensor, actuator, and controller module to perform a mission. The robot is also equipped by software which can do localization and mapping. Topological Simultaneous Localization and Mapping (TSLAM) method will be used.
format Final Project
author RICKY (NIM 13205030), VINCENTIUS
spellingShingle RICKY (NIM 13205030), VINCENTIUS
#TITLE_ALTERNATIVE#
author_facet RICKY (NIM 13205030), VINCENTIUS
author_sort RICKY (NIM 13205030), VINCENTIUS
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/12749
_version_ 1820728612780769280