#TITLE_ALTERNATIVE#
This final project will discuss about generating unit maintenance scheduling with Levelized Risk Methode. The objective that the risk <br /> <br /> <br /> is made more or less the same throughout the period under study is realized through maintenance scheduling optimization. In t...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/13251 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |