#TITLE_ALTERNATIVE#

This final project will discuss about generating unit maintenance scheduling with Levelized Risk Methode. The objective that the risk <br /> <br /> <br /> is made more or less the same throughout the period under study is realized through maintenance scheduling optimization. In t...

Full description

Saved in:
Bibliographic Details
Main Author: MAHAGA PUTRA (NIM 13205129); Pembimbing : Dr.Ir. Muhammad Nurdin dan Dr.Ir. Nanang Haryanto, M., ANDI
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/13251
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia