#TITLE_ALTERNATIVE#
This final project will discuss about generating unit maintenance scheduling with Levelized Risk Methode. The objective that the risk <br /> <br /> <br /> is made more or less the same throughout the period under study is realized through maintenance scheduling optimization. In t...
Saved in:
Main Author: | MAHAGA PUTRA (NIM 13205129); Pembimbing : Dr.Ir. Muhammad Nurdin dan Dr.Ir. Nanang Haryanto, M., ANDI |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/13251 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: RIZKI WARDANA (NIM : 13205178); Pembimbing : Dr.Ir. Muhammad Nurdin; Dr.Ir. Nanang Haryanto, FELA -
#TITLE_ALTERNATIVE#
by: ARDIYANTO (NIM : 13205189); Pembimbing : Dr.Ir. Muhammad Nurdin; Dr. Ir. Nanang Haryanto, TRI -
#TITLE_ALTERNATIVE#
by: KHADAFI (NIM 13205003); Pembimbing: Dr.Ir. Muhammad Nurdin dan Dr.Ir. Nanang HariyantoMUHAM, MUHAMMAD -
#TITLE_ALTERNATIVE#
by: SONDANG DOLI NOVIEDO (NIM : 13205110); Pembimbing : Dr.Ir. Muhammad Nurdin; Dr.Ir. Nanang, JONGGURAN -
#TITLE_ALTERNATIVE#
by: FADHLI (NIM 13205097); Pembimbing: Dr. Ir. Muhammad Nurdin dan Dr.Ir.Nanang Haryanto, MT., FUAD