#TITLE_ALTERNATIVE#
<p align="justify">Medium voltage distribution system of 20 kV of PT. PLN (Persero) Wilayah Sumatra Utara Cabang Medan had experienced many over current faults that caused extinguishing of power supply to consumers. These extinguishing were caused by the condition and the selection o...
Saved in:
Main Author: | PUTRA KURNIAWAN (NIM 13203176); Pembimbing: Dr. Ir. Redy Mardiana, ANGKI |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/13263 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: KURNIAWAN (NIM 12206079); Pembimbing: Dr.Ir. Pudjo Sukarno, ADITYA -
#TITLE_ALTERNATIVE#
by: DIMAS KURNIAWAN (NIM. 12005044); Pembimbing: Dr.Ir. Prihadi Sumintadiredja, AGUNG -
#TITLE_ALTERNATIVE#
by: KURNIAWAN (NIM 12006035); Pembimbing: Dr.Ir.Chalid Idham Abdullah, ADE -
#TITLE_ALTERNATIVE#
by: ADYTIA PUTRA (NIM : 13206077) ; pembimbing : Dr. Adit kurniawan, M.Eng ; Nanang Setya Wardana,, NIKI -
#TITLE_ALTERNATIVE#
by: PERDANA PUTRA (NIM 12206100); Pembimbing: Dr.Ir. Pudjo Sukarno, RIA