#TITLE_ALTERNATIVE#

Important functions of well testing are useful to identify the characteristics of a reservoir and can also be used for a well production optimization. Back pressure test is one of several methods of well testing that provides highly reliable outputs if it is provided by an adequate opening time. On...

Full description

Saved in:
Bibliographic Details
Main Author: SANTO (NIM 12206043); Pembimbing: Ir. Tutuka Ariadji, M.Sc., Ph.D., ASMORO
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/13308
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:13308
spelling id-itb.:133082017-09-27T10:37:30Z#TITLE_ALTERNATIVE# SANTO (NIM 12206043); Pembimbing: Ir. Tutuka Ariadji, M.Sc., Ph.D., ASMORO Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/13308 Important functions of well testing are useful to identify the characteristics of a reservoir and can also be used for a well production optimization. Back pressure test is one of several methods of well testing that provides highly reliable outputs if it is provided by an adequate opening time. On the other hand, testing durations should also be considered due to an expensive cost. In relation to this important matter, this study is aimed to create a simple correlation to determine a well opening time for the back pressure test. The model used in this study is based on a cylindrical homogeneous oil reservoir with one well located in the center of a reservoir. This model is then validated using a Pressure Transient Analysis so that the reservoir data inputed in the simulator and with respect to time the Pressure Transient Analysis results are matched. The reservoir simulation used in this study is to generate a profile of pressure time of the back pressure test and generate a correlation through sensitivity analysis.<p>From the back pressure test data, reservoir performance is analyzed using the Inflow Performance Relationship (IPR) and Tubing Performance Relationship (TPR) to create a nodal analysis in order to obtain an optimum oil flow rate from the well. This study obtains a correlation to determine the oil flow rate by considering the sensitivity analysis of the reservoir and tubing parameters. The generated correlation is in the form of polynomial equation with 94% accuracy and the highest order is three. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Important functions of well testing are useful to identify the characteristics of a reservoir and can also be used for a well production optimization. Back pressure test is one of several methods of well testing that provides highly reliable outputs if it is provided by an adequate opening time. On the other hand, testing durations should also be considered due to an expensive cost. In relation to this important matter, this study is aimed to create a simple correlation to determine a well opening time for the back pressure test. The model used in this study is based on a cylindrical homogeneous oil reservoir with one well located in the center of a reservoir. This model is then validated using a Pressure Transient Analysis so that the reservoir data inputed in the simulator and with respect to time the Pressure Transient Analysis results are matched. The reservoir simulation used in this study is to generate a profile of pressure time of the back pressure test and generate a correlation through sensitivity analysis.<p>From the back pressure test data, reservoir performance is analyzed using the Inflow Performance Relationship (IPR) and Tubing Performance Relationship (TPR) to create a nodal analysis in order to obtain an optimum oil flow rate from the well. This study obtains a correlation to determine the oil flow rate by considering the sensitivity analysis of the reservoir and tubing parameters. The generated correlation is in the form of polynomial equation with 94% accuracy and the highest order is three.
format Final Project
author SANTO (NIM 12206043); Pembimbing: Ir. Tutuka Ariadji, M.Sc., Ph.D., ASMORO
spellingShingle SANTO (NIM 12206043); Pembimbing: Ir. Tutuka Ariadji, M.Sc., Ph.D., ASMORO
#TITLE_ALTERNATIVE#
author_facet SANTO (NIM 12206043); Pembimbing: Ir. Tutuka Ariadji, M.Sc., Ph.D., ASMORO
author_sort SANTO (NIM 12206043); Pembimbing: Ir. Tutuka Ariadji, M.Sc., Ph.D., ASMORO
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/13308
_version_ 1820736148678377472