#TITLE_ALTERNATIVE#
Cisangkuy-Pataruman river has a large amount of electrical-energy potencies. Cisangkuy-Pataruman micro-hydro powerplant system using single 3,5 m3/s-flow- turbine will produce 2856,73 MWh annual-energy. Double 3,5 m3/s-turbines system and single 5,25 m3/s-turbine system will result 1,5 and 1,1 bigge...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/13973 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Cisangkuy-Pataruman river has a large amount of electrical-energy potencies. Cisangkuy-Pataruman micro-hydro powerplant system using single 3,5 m3/s-flow- turbine will produce 2856,73 MWh annual-energy. Double 3,5 m3/s-turbines system and single 5,25 m3/s-turbine system will result 1,5 and 1,1 bigger energy than 3,5 m3/s- turbine system, respectively. But, economic analysis must be performed to observe whether these bigger energies will also result bigger profit or not. This study predicts that double-3,5 m3/s-turbines system and 5,25 m3/s-turbine system need 1,8 and 1,5 greater investment cost than single-3,5 m3/s turbine sistem, respectively. A number of evaluation methods show that the single-3,5 m3/s-turbine system is more profitable than two other systems. |
---|