#TITLE_ALTERNATIVE#
Cisangkuy-Pataruman river has a large amount of electrical-energy potencies. Cisangkuy-Pataruman micro-hydro powerplant system using single 3,5 m3/s-flow- turbine will produce 2856,73 MWh annual-energy. Double 3,5 m3/s-turbines system and single 5,25 m3/s-turbine system will result 1,5 and 1,1 bigge...
Saved in:
Main Author: | LESMANA (NIM 13204135); Pembimbing : Dr. Ir. Mukmin Widyanto A., ANDIKA |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/13973 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: PRAYOGA (NIM 13204003); Pembimbing : Dr. Ir. Mukmin Widyanto Atmopawiro, GAMA -
#TITLE_ALTERNATIVE#
by: AWALUDDIN ALAFGHANI (NIM : 13203086); Pembimbing : Dr. Ir. Mukmin Widyanto A., M. -
#TITLE_ALTERNATIVE#
by: CHRISTMAN HALOMOAN SITUMORANG (NIM 13204205); Pembimbing: Dr. Ir. Mukmin Widyanto A., ARDO -
#TITLE_ALTERNATIVE#
by: INKARESA (NIM : 13206037); Pembimbing : Dr. Ir. Mukmin W. Atmopawiro, ARDIAN -
#TITLE_ALTERNATIVE#
by: FUAD (NIM : 13206052); pembimbing :Dr. Ir. Mukmin W. ATMOPAWIRO, MUHAMMAD