#TITLE_ALTERNATIVE#
Up until now, the number of land surveying requests – both the first time and maintenance surveys that’d been submitted to East Jakarta Office of Land Affair were quite a count. To fulfill that uprising demands, measuring officers alone are incapable enough, since their limited capacity. Thus,...
Saved in:
Main Author: | ROHANDA REBONG (NIM 15106007); Pembimbing: Ir. Kurdinanto Sarah, MSP., FRANSISKO |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14181 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: A. K. KAUNANG (NIM 10901016), FRANSISKO -
#TITLE_ALTERNATIVE#
by: Fransisko (NIM 132 03 170), Freddy -
#TITLE_ALTERNATIVE#
by: YOVITA (NIM 15204089); Pembimbing: Ir. Sutan Hidayatsyah, MSP., WANDA -
#TITLE_ALTERNATIVE#
by: RAMDHANI (NIM 19006109); Pembimbing: Ir. Budi Permadi Iskandar MSP., AMALDA -
#TITLE_ALTERNATIVE#
by: IBADILLAH (NIM 19007034); Pembimbing: Ir. Budi Permadi Iskandar, MSP., IKROMU