#TITLE_ALTERNATIVE#
Deliverability of gas wells is very strategic in the operation plan of any gas field. Gas <br /> <br /> <br /> <br /> <br /> deliverability process includes determination of plateau rate, plateau time, inflow <br /> <br /> <br /> <br /&g...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14234 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | Deliverability of gas wells is very strategic in the operation plan of any gas field. Gas <br />
<br />
<br />
<br />
<br />
deliverability process includes determination of plateau rate, plateau time, inflow <br />
<br />
<br />
<br />
<br />
performance relationship, outflow performance relationship, fluid flow on the pipe, <br />
<br />
<br />
<br />
<br />
material balance and system production analysis. The main problem in multiwall <br />
<br />
<br />
<br />
<br />
system is how to allocate flow rate to each well for satisfying the contract value. In <br />
<br />
<br />
<br />
<br />
the first production period, normally the allocation in each well, which done using <br />
<br />
<br />
<br />
<br />
AOF comparison’s method. On the second production period, the allocation in each <br />
<br />
<br />
<br />
<br />
well, which done using optimization’s method. In this time, we get a condition where <br />
<br />
<br />
<br />
<br />
one or more than one gas flow rate allocation is bigger than their normal flow rate. <br />
<br />
<br />
<br />
<br />
The one way to solve this problem is reallocates flow rate with normal flow rate as a <br />
<br />
<br />
<br />
<br />
constraint for each well. Genetic algorithm is used to solve that’s optimization <br />
<br />
<br />
<br />
<br />
problem. In this final project, it will be showed that the better way for allocating flow <br />
<br />
<br />
<br />
<br />
rate on every period is using AOF comparison’s method first and then using heuristic <br />
<br />
<br />
<br />
<br />
method until the contract value is satisfied. |
---|