#TITLE_ALTERNATIVE#
Deliverability of gas wells is very strategic in the operation plan of any gas field. Gas <br /> <br /> <br /> <br /> <br /> deliverability process includes determination of plateau rate, plateau time, inflow <br /> <br /> <br /> <br /&g...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14234 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:14234 |
---|---|
spelling |
id-itb.:142342017-09-27T11:43:01Z#TITLE_ALTERNATIVE# PRATAMA PUTRA MR (NIM 10107068); Pembimbing : Prof. Dr. Edy Soewono dan Prof. Dr. Ir. Pudjo So, INDRA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/14234 Deliverability of gas wells is very strategic in the operation plan of any gas field. Gas <br /> <br /> <br /> <br /> <br /> deliverability process includes determination of plateau rate, plateau time, inflow <br /> <br /> <br /> <br /> <br /> performance relationship, outflow performance relationship, fluid flow on the pipe, <br /> <br /> <br /> <br /> <br /> material balance and system production analysis. The main problem in multiwall <br /> <br /> <br /> <br /> <br /> system is how to allocate flow rate to each well for satisfying the contract value. In <br /> <br /> <br /> <br /> <br /> the first production period, normally the allocation in each well, which done using <br /> <br /> <br /> <br /> <br /> AOF comparison’s method. On the second production period, the allocation in each <br /> <br /> <br /> <br /> <br /> well, which done using optimization’s method. In this time, we get a condition where <br /> <br /> <br /> <br /> <br /> one or more than one gas flow rate allocation is bigger than their normal flow rate. <br /> <br /> <br /> <br /> <br /> The one way to solve this problem is reallocates flow rate with normal flow rate as a <br /> <br /> <br /> <br /> <br /> constraint for each well. Genetic algorithm is used to solve that’s optimization <br /> <br /> <br /> <br /> <br /> problem. In this final project, it will be showed that the better way for allocating flow <br /> <br /> <br /> <br /> <br /> rate on every period is using AOF comparison’s method first and then using heuristic <br /> <br /> <br /> <br /> <br /> method until the contract value is satisfied. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
Deliverability of gas wells is very strategic in the operation plan of any gas field. Gas <br />
<br />
<br />
<br />
<br />
deliverability process includes determination of plateau rate, plateau time, inflow <br />
<br />
<br />
<br />
<br />
performance relationship, outflow performance relationship, fluid flow on the pipe, <br />
<br />
<br />
<br />
<br />
material balance and system production analysis. The main problem in multiwall <br />
<br />
<br />
<br />
<br />
system is how to allocate flow rate to each well for satisfying the contract value. In <br />
<br />
<br />
<br />
<br />
the first production period, normally the allocation in each well, which done using <br />
<br />
<br />
<br />
<br />
AOF comparison’s method. On the second production period, the allocation in each <br />
<br />
<br />
<br />
<br />
well, which done using optimization’s method. In this time, we get a condition where <br />
<br />
<br />
<br />
<br />
one or more than one gas flow rate allocation is bigger than their normal flow rate. <br />
<br />
<br />
<br />
<br />
The one way to solve this problem is reallocates flow rate with normal flow rate as a <br />
<br />
<br />
<br />
<br />
constraint for each well. Genetic algorithm is used to solve that’s optimization <br />
<br />
<br />
<br />
<br />
problem. In this final project, it will be showed that the better way for allocating flow <br />
<br />
<br />
<br />
<br />
rate on every period is using AOF comparison’s method first and then using heuristic <br />
<br />
<br />
<br />
<br />
method until the contract value is satisfied. |
format |
Final Project |
author |
PRATAMA PUTRA MR (NIM 10107068); Pembimbing : Prof. Dr. Edy Soewono dan Prof. Dr. Ir. Pudjo So, INDRA |
spellingShingle |
PRATAMA PUTRA MR (NIM 10107068); Pembimbing : Prof. Dr. Edy Soewono dan Prof. Dr. Ir. Pudjo So, INDRA #TITLE_ALTERNATIVE# |
author_facet |
PRATAMA PUTRA MR (NIM 10107068); Pembimbing : Prof. Dr. Edy Soewono dan Prof. Dr. Ir. Pudjo So, INDRA |
author_sort |
PRATAMA PUTRA MR (NIM 10107068); Pembimbing : Prof. Dr. Edy Soewono dan Prof. Dr. Ir. Pudjo So, INDRA |
title |
#TITLE_ALTERNATIVE# |
title_short |
#TITLE_ALTERNATIVE# |
title_full |
#TITLE_ALTERNATIVE# |
title_fullStr |
#TITLE_ALTERNATIVE# |
title_full_unstemmed |
#TITLE_ALTERNATIVE# |
title_sort |
#title_alternative# |
url |
https://digilib.itb.ac.id/gdl/view/14234 |
_version_ |
1820737154659123200 |