#TITLE_ALTERNATIVE#
The construction project is a kind of project that has relatively high risks for the uncertain events compared with other projects such as manufactures. It is due to the fact that the construction project activities are unique, complex, and dynamic on each site and not always a repeated activity, an...
Saved in:
Main Author: | ERNESTINE LATUPEIRISSA (NIM 35002001); Pembimbing: Amrinsyah Nasution,Prof, Ir, MSCE.,Ph., JOSEFINE |
---|---|
Format: | Dissertations |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14262 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: HARIS (NIM : 35005009); Tim Pembimbing : Prof. Ir. Amrinsyah Nasution, MSCE, Ph.D; Dr. Ir. Si, ABDUL -
#TITLE_ALTERNATIVE#
by: KIMSAN (NIM : 15001069); ASRUL AHDAR (NIM : 15001090); Pembimbing : Prof. Ir. Amrinsyah Nas, MASYKUR -
#TITLE_ALTERNATIVE#
by: (NIM 20297017); Pembimbing: Gunawan Handayani, MSCE, Ph.D., ERFAN -
#TITLE_ALTERNATIVE#
by: (NIM : 10206067); Pembimbing : Gunawan Handayani, MSCE, Ph.D, HAMZAH -
#TITLE_ALTERNATIVE#
by: JAYASAPUTRA (NIM : 25007031); Pembimbing : Ir. I Wayan Sengara., MSCE., Ph.D, UUN