#TITLE_ALTERNATIVE#
Drilling with narrow pressure window will cause many problem in well control and cost. To overcome this problem, managed pressured drilling have been developed. Dual Gradient drilling is one of alternative to drilling in offshore, which have narrow pressure window. Hydraulics very close related with...
Saved in:
Main Author: | TANDEPADANG (NIM 12206096); Pembimbing: Prof. Dr.-Ing. Ir. Rudi Rubiandini R.S., JURYANTO |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14267 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: APRIANDI (NIM 12206059); Pembimbing: Prof. Dr.-Ing Ir. Rudi Rubiandini R.S., RIAN -
#TITLE_ALTERNATIVE#
by: SYAM NURLIA (NIM 12205051); Pembimbing: Dr.-Ing.Ir.Rudi Rubiandini R.S., DIAN -
#TITLE_ALTERNATIVE#
by: SILVI NOVIANA (NIM 12205036); Pembimbing: Dr.-Ing. Ir. Rudi Rubiandini R.S., DINA -
#TITLE_ALTERNATIVE#
by: DITO PRATAMA (NIM 12206062); Pembimbing: Prof. Dr.-Ing. Ir. Rudi Rubiandini R.S., ARIAN -
#TITLE_ALTERNATIVE#
by: FAUZI IKHSAN (NIM 12206005); Pembimbing: Prof. Dr.-Ing. Ir. Rudi Rubiandini R.S., TENGKU