#TITLE_ALTERNATIVE#
In the process of natural gas supply, the level of efficiency and effectiveness are required. It is for can be distributed quickly and evenly, among others, use the gas pipeline under the sea. In the process of underwater gas pipe installation, requires detailed information about the condition of th...
Saved in:
Main Author: | AZIS (NIM 15106044); Pembimbing: Dr. Ir. Eka Djunarsjah, MT. dan Ir. Catur Purwanto, MT., LUKMAN |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14288 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: KAROSEKALI (NIM 15106048); Pembimbing: Dr. Ir. Eka Djunarsjah, MT., dan Ir. Catur Purwanto,, HERIANTO -
#TITLE_ALTERNATIVE#
by: CATUR ANINDHITO (NIM 15106040); Pembimbing: Dr. Ir. Eka Djunarsjah, MT., MAHARSI -
#TITLE_ALTERNATIVE#
by: SETIAWAN (NIM 15106059); Pembimbing: Dr. Ir. Eka Djunarsjah, MT dan Ir. Bernad Silaban, AJI -
#TITLE_ALTERNATIVE#
by: ARDIANSYAH (NIM 15106022); Pembimbing: Dr. Ir. Eka Djunarsjah., MT., dan Ir. Rudy Ernawan, WAHYU -
#TITLE_ALTERNATIVE#
by: IRWANSYAH (NIM 15103007); Pembimbing : Dr. Ir. Eka Djunarsjah, M.T., AGUS