#TITLE_ALTERNATIVE#

The purpose of this final project is to determine the time when liquid loading problem is happened for the hypotetic reservoir and well system using minimum gas production rate calculated by Turner2 and Nossier3 equation. Besides rate production data, other data like well flowing pressure, LGR, well...

Full description

Saved in:
Bibliographic Details
Main Author: AKMAL (NIM 12205065); Pembimbing: Dr. Ir. Pudjo Sukarno, MUHAMMAD
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/14328
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia

Similar Items