#TITLE_ALTERNATIVE#
The purpose of this final project is to determine the time when liquid loading problem is happened for the hypotetic reservoir and well system using minimum gas production rate calculated by Turner2 and Nossier3 equation. Besides rate production data, other data like well flowing pressure, LGR, well...
Saved in:
Main Author: | AKMAL (NIM 12205065); Pembimbing: Dr. Ir. Pudjo Sukarno, MUHAMMAD |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14328 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
Similar Items
-
#TITLE_ALTERNATIVE#
by: KURNIAWAN (NIM 12206079); Pembimbing: Dr.Ir. Pudjo Sukarno, ADITYA -
#TITLE_ALTERNATIVE#
by: SUMARWOTO (NIM 12206047); Pembimbing: Dr.Ir. Pudjo Sukarno, DWIYANANTA -
#TITLE_ALTERNATIVE#
by: FIRMANSYAH (NIM 12206077); Pembimbing: Dr.Ir. Pudjo Sukarno, BONANG -
#TITLE_ALTERNATIVE#
by: MUCHIBBUS SAJJAD (NIM 12206074); Pembimbing: Dr.Ir. Pudjo Sukarno, FARASDAQ -
#TITLE_ALTERNATIVE#
by: ENDAH PRASTITI (NIM 12206008); Pembimbing: Dr.Ir. Pudjo Sukarno, GESA