#TITLE_ALTERNATIVE#
The purpose of this final project is to determine the time when liquid loading problem is happened for the hypotetic reservoir and well system using minimum gas production rate calculated by Turner2 and Nossier3 equation. Besides rate production data, other data like well flowing pressure, LGR, well...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14328 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!