Subsea pipeline requires a perfect design and a meticulous installation process therefor the entire pipeline construction process will be successful and cost-effectively. Construction of the subsea pipeline is divided into three stages; pre-lay survey, subsea pipeline installation, and as-laid surve...

Full description

Saved in:
Bibliographic Details
Main Author: FIRDAUS (NIM 15108028); Pembimbing: Dr. Ir. Eka Djunarsjah, MT dan Ir .Syamsul Bachri, M.En, MUHAMMAD
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/14331
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:14331
spelling id-itb.:143312017-10-09T10:51:08Z#TITLE_ALTERNATIVE# FIRDAUS (NIM 15108028); Pembimbing: Dr. Ir. Eka Djunarsjah, MT dan Ir .Syamsul Bachri, M.En, MUHAMMAD Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/14331 Subsea pipeline requires a perfect design and a meticulous installation process therefor the entire pipeline construction process will be successful and cost-effectively. Construction of the subsea pipeline is divided into three stages; pre-lay survey, subsea pipeline installation, and as-laid survey. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Verification of subsea pipeline is a part of as-laid survey, with the main objective to get the final position of the installed subsea pipeline. In this thesis, the writer done a multibeam echosounder data processing using the QINSy software for acquiring the final position coordinate. In addition, there is also performed an analysis of the comparative position of the subsea pipeline route plan to the position of the pipe results from multibeam echosounder data processing. The analysis will then be used for consideration in planning for the construction of the subsea pipeline in the same area. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Multibeam echosounder data processing results showed that there are differences in the position of planning and the actual position of the subsea pipeline. Difference occurs in the position of the winding pipe with a difference as far as 5.4 m. The differences found in the winding pipe are still in acceptable condition, because there is no free-span pipe and this pipe does not result in conflict with the other existing subsea pipeline. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Subsea pipeline requires a perfect design and a meticulous installation process therefor the entire pipeline construction process will be successful and cost-effectively. Construction of the subsea pipeline is divided into three stages; pre-lay survey, subsea pipeline installation, and as-laid survey. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Verification of subsea pipeline is a part of as-laid survey, with the main objective to get the final position of the installed subsea pipeline. In this thesis, the writer done a multibeam echosounder data processing using the QINSy software for acquiring the final position coordinate. In addition, there is also performed an analysis of the comparative position of the subsea pipeline route plan to the position of the pipe results from multibeam echosounder data processing. The analysis will then be used for consideration in planning for the construction of the subsea pipeline in the same area. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> Multibeam echosounder data processing results showed that there are differences in the position of planning and the actual position of the subsea pipeline. Difference occurs in the position of the winding pipe with a difference as far as 5.4 m. The differences found in the winding pipe are still in acceptable condition, because there is no free-span pipe and this pipe does not result in conflict with the other existing subsea pipeline.
format Final Project
author FIRDAUS (NIM 15108028); Pembimbing: Dr. Ir. Eka Djunarsjah, MT dan Ir .Syamsul Bachri, M.En, MUHAMMAD
spellingShingle FIRDAUS (NIM 15108028); Pembimbing: Dr. Ir. Eka Djunarsjah, MT dan Ir .Syamsul Bachri, M.En, MUHAMMAD
#TITLE_ALTERNATIVE#
author_facet FIRDAUS (NIM 15108028); Pembimbing: Dr. Ir. Eka Djunarsjah, MT dan Ir .Syamsul Bachri, M.En, MUHAMMAD
author_sort FIRDAUS (NIM 15108028); Pembimbing: Dr. Ir. Eka Djunarsjah, MT dan Ir .Syamsul Bachri, M.En, MUHAMMAD
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/14331
_version_ 1820737184360038400