#TITLE_ALTERNATIVE#
Subsea pipeline requires a perfect design and a meticulous installation process therefor the entire pipeline construction process will be successful and cost-effectively. Construction of the subsea pipeline is divided into three stages; pre-lay survey, subsea pipeline installation, and as-laid surve...
Saved in:
Main Author: | FIRDAUS (NIM 15108028); Pembimbing: Dr. Ir. Eka Djunarsjah, MT dan Ir .Syamsul Bachri, M.En, MUHAMMAD |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14331 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: TURNIP (NIM: 15109098); Pembimbing: Dr. Ir. Eka Djunarsjah, M.T.; Ir. Samsul Bachri, M.Eng. P, BORIS -
#TITLE_ALTERNATIVE#
by: HAMDANIS (NIM 15106020); Pembimbing: Dr. Ir. Eka Djunarsjah, MT, MUHAMMAD -
#TITLE_ALTERNATIVE#
by: AZIS (NIM 15106044); Pembimbing: Dr. Ir. Eka Djunarsjah, MT. dan Ir. Catur Purwanto, MT., LUKMAN -
#TITLE_ALTERNATIVE#
by: (NIM 15104061); Pembimbing: Dr. Ir. Eka Djunarsjah, M.T., dan Sofan Prihadi, ST. , JUMADI -
#TITLE_ALTERNATIVE#
by: HARBIMAHARANI (NIM 15105029); Pembimbing: Eka Djunarsjah, Dr., Ir., M.T., dan Andri Hernandi, , HANNI