#TITLE_ALTERNATIVE#

The government has required all coal companies to transport the product of coal through the private line, because public infrastructure will not be able to accomodate heavy vehicles of coal transportation. If the coal transport is forced through the public line, it will ruin and make overload capaci...

Full description

Saved in:
Bibliographic Details
Main Author: HAIQAL (NIM 15108027);pembimbing : Dr.Ir. Eka Djunarsjah, M.T. ; Banu Prabowo, S.T., MUHAMMAD
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/16559
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia