#TITLE_ALTERNATIVE#
Toll road investment project is full of risks. The potential risks can lead to disadvantage such as failure to the target which is planned. This final project is trying to analyze the risk of Depok-Antasari toll road investment based on guide from Pusat Litbang Prasarana Transportasi, Badan Litbang...
Saved in:
Main Author: | NINGRUM (NIM 29105324); Pembimbing : Dr. Ir. Sudarso Kaderi Wiryono, RATNA |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14414 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: PARAMASTRI (NIM 19006069); Pembimbing: Dr. Ir. Sudarso Kaderi Wiryono, DANURIA -
#TITLE_ALTERNATIVE#
by: RUSHANDIE (NIM 19006049); Pembimbing: Dr. Ir. Sudarso Kaderi Wiryono, ROBY -
#TITLE_ALTERNATIVE#
by: BOEDISANTOSO (NIM: 29106347); Pembimbing : Dr. Ir. Sudarso Kaderi Wiryono, MARIJANI -
#TITLE_ALTERNATIVE#
by: SEKAR PUTRI (NIM 19006044); Pembimbing: Dr.Ir.Sudarso Kaderi Wiryono, ANINDA -
#TITLE_ALTERNATIVE#
by: TOFANO BOBIAN (NIM 19006042); Pembimbing: Dr. Ir. Sudarso Kaderi Wiryono, ERIC