#TITLE_ALTERNATIVE#
In gas production process, capability of reservoir to deliver gas (gas deliver- <br /> <br /> <br /> <br /> <br /> ability) will decrease as a result of reservoir pressure drop. This may cause <br /> <br /> <br /> <br /> <br />...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14488 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Summary: | In gas production process, capability of reservoir to deliver gas (gas deliver- <br />
<br />
<br />
<br />
<br />
ability) will decrease as a result of reservoir pressure drop. This may cause <br />
<br />
<br />
<br />
<br />
the undeliverability of the production target as state in the contract.One of <br />
<br />
<br />
<br />
<br />
the ways that producer can do is by opening new wells. By opening new wells, <br />
<br />
<br />
<br />
<br />
the capability of reservoir to deliver the gas will increase. The objective of <br />
<br />
<br />
<br />
<br />
this thesis is to estimate how long reservoir can deliver gas with constant rate <br />
<br />
<br />
<br />
<br />
and to determine the number of new wells that should be open in order to sat- <br />
<br />
<br />
<br />
<br />
isfy the production target. Here heuristic optimization method and concept of <br />
<br />
<br />
<br />
<br />
multi well gas deliverability are used to solve this problem. Simulation results <br />
<br />
<br />
<br />
<br />
are done with some hypothetical data. |
---|