#TITLE_ALTERNATIVE#
In gas production process, capability of reservoir to deliver gas (gas deliver- <br /> <br /> <br /> <br /> <br /> ability) will decrease as a result of reservoir pressure drop. This may cause <br /> <br /> <br /> <br /> <br />...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14488 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:14488 |
---|---|
spelling |
id-itb.:144882017-09-27T11:43:01Z#TITLE_ALTERNATIVE# SARI UTAMI (NIM 10107058); Pembimbing : Prof. Dr. Edy Soewono, SARAH Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/14488 In gas production process, capability of reservoir to deliver gas (gas deliver- <br /> <br /> <br /> <br /> <br /> ability) will decrease as a result of reservoir pressure drop. This may cause <br /> <br /> <br /> <br /> <br /> the undeliverability of the production target as state in the contract.One of <br /> <br /> <br /> <br /> <br /> the ways that producer can do is by opening new wells. By opening new wells, <br /> <br /> <br /> <br /> <br /> the capability of reservoir to deliver the gas will increase. The objective of <br /> <br /> <br /> <br /> <br /> this thesis is to estimate how long reservoir can deliver gas with constant rate <br /> <br /> <br /> <br /> <br /> and to determine the number of new wells that should be open in order to sat- <br /> <br /> <br /> <br /> <br /> isfy the production target. Here heuristic optimization method and concept of <br /> <br /> <br /> <br /> <br /> multi well gas deliverability are used to solve this problem. Simulation results <br /> <br /> <br /> <br /> <br /> are done with some hypothetical data. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
In gas production process, capability of reservoir to deliver gas (gas deliver- <br />
<br />
<br />
<br />
<br />
ability) will decrease as a result of reservoir pressure drop. This may cause <br />
<br />
<br />
<br />
<br />
the undeliverability of the production target as state in the contract.One of <br />
<br />
<br />
<br />
<br />
the ways that producer can do is by opening new wells. By opening new wells, <br />
<br />
<br />
<br />
<br />
the capability of reservoir to deliver the gas will increase. The objective of <br />
<br />
<br />
<br />
<br />
this thesis is to estimate how long reservoir can deliver gas with constant rate <br />
<br />
<br />
<br />
<br />
and to determine the number of new wells that should be open in order to sat- <br />
<br />
<br />
<br />
<br />
isfy the production target. Here heuristic optimization method and concept of <br />
<br />
<br />
<br />
<br />
multi well gas deliverability are used to solve this problem. Simulation results <br />
<br />
<br />
<br />
<br />
are done with some hypothetical data. |
format |
Final Project |
author |
SARI UTAMI (NIM 10107058); Pembimbing : Prof. Dr. Edy Soewono, SARAH |
spellingShingle |
SARI UTAMI (NIM 10107058); Pembimbing : Prof. Dr. Edy Soewono, SARAH #TITLE_ALTERNATIVE# |
author_facet |
SARI UTAMI (NIM 10107058); Pembimbing : Prof. Dr. Edy Soewono, SARAH |
author_sort |
SARI UTAMI (NIM 10107058); Pembimbing : Prof. Dr. Edy Soewono, SARAH |
title |
#TITLE_ALTERNATIVE# |
title_short |
#TITLE_ALTERNATIVE# |
title_full |
#TITLE_ALTERNATIVE# |
title_fullStr |
#TITLE_ALTERNATIVE# |
title_full_unstemmed |
#TITLE_ALTERNATIVE# |
title_sort |
#title_alternative# |
url |
https://digilib.itb.ac.id/gdl/view/14488 |
_version_ |
1820737232436199424 |