#TITLE_ALTERNATIVE#
Crew scheduling problem is a difficult problem to solve since it involves a lot of data and crew's labor regulations. Crew scheduling problem usually performed in two steps: the construction of the minimum set of pairings and crew rostering problem. Pairing is a work schedule, consisting of a s...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14546 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Be the first to leave a comment!