#TITLE_ALTERNATIVE#
Crew scheduling problem is a difficult problem to solve since it involves a lot of data and crew's labor regulations. Crew scheduling problem usually performed in two steps: the construction of the minimum set of pairings and crew rostering problem. Pairing is a work schedule, consisting of a s...
Saved in:
Main Author: | WIJAYANTI (NIM 10107074); Pembimbing : Dr. Rieske Hadianti, WIDYA |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14546 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: IRAWATI (NIM 10107079); Pembimbing : Dr. Rieske Hadianti, ADE -
#TITLE_ALTERNATIVE#
by: PUSPITASARI (NIM 10107051); Pembimbing : Dr. Rieske Hadianti, RIZKA -
#TITLE_ALTERNATIVE#
by: DWI RAHAYU (NIM 10107045); Pembimbing : Dr. Rieske Hadianti, IMANIAR -
#TITLE_ALTERNATIVE#
by: DESRINA MUNAF (NIM : 10105014); Pembimbing : Dr. Rieske Hadianti, ANISA -
#TITLE_ALTERNATIVE#
by: WARNITA (NIM : 10107003); Dosen Pembimbing : Dr. Rieske Hadianti, WIDA