The construction industry has a high risk factor because of frequent delays in project completion which adds to costs. Risk analysis has not been applied properly on some contractors. Therefore it is necessary to do research on the identification and analysis of risks in the implementation of constr...

Full description

Saved in:
Bibliographic Details
Main Author: NURHAYATI (NIM : 23411067); Pembimbing : Dr. Ir. Budhi Prihartono, DEA, AI
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/14756
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:14756
spelling id-itb.:147562017-09-27T14:50:39Z#TITLE_ALTERNATIVE# NURHAYATI (NIM : 23411067); Pembimbing : Dr. Ir. Budhi Prihartono, DEA, AI Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/14756 The construction industry has a high risk factor because of frequent delays in project completion which adds to costs. Risk analysis has not been applied properly on some contractors. Therefore it is necessary to do research on the identification and analysis of risks in the implementation of construction projects. This research was conducted in PT WIKA at ITB building project. During this PT. WIKA only use risk registers based on experience, so PT. WIKA not consider other alternatives in predicting the opportunities and impact of risks. Therefore, through this study will develop a model identification and risk analysis. <br /> <br /> <br /> Real problems faced by PT. WIKA long run building projects include the risks that occur in the field including force majeure risk, the risk of late procurement and other risks that hinder the project. Through the study of literature, questionnaires and interviews of stakeholders PT. WIKA has identified 73 types of risk are predicted to inhibit the ITB building projects. <br /> <br /> <br /> This study develops a model for risk evaluation method by combining Concentrated Numeric Matrix Statistics (CNSM) (Gao et al, 2013) with the method of ALARP (As Low As Reasonably Practicable) (Liu et al, 2011). Risk analysis aims to determine which types of risk, including the highest category value opportunities and risk exposures. Test reliability for each type of risk by computing the dispersion formula G. G can calculate the size of the value of consistency level agreements questionnaire answers from stakeholders. After classification, the risk rating can be done to reduce the impact of risk mitigation of risk. The results using data from 73 kinds of risks there are 5 types of risks including high risk categories that need to be responded to through the mitigation of risk. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description The construction industry has a high risk factor because of frequent delays in project completion which adds to costs. Risk analysis has not been applied properly on some contractors. Therefore it is necessary to do research on the identification and analysis of risks in the implementation of construction projects. This research was conducted in PT WIKA at ITB building project. During this PT. WIKA only use risk registers based on experience, so PT. WIKA not consider other alternatives in predicting the opportunities and impact of risks. Therefore, through this study will develop a model identification and risk analysis. <br /> <br /> <br /> Real problems faced by PT. WIKA long run building projects include the risks that occur in the field including force majeure risk, the risk of late procurement and other risks that hinder the project. Through the study of literature, questionnaires and interviews of stakeholders PT. WIKA has identified 73 types of risk are predicted to inhibit the ITB building projects. <br /> <br /> <br /> This study develops a model for risk evaluation method by combining Concentrated Numeric Matrix Statistics (CNSM) (Gao et al, 2013) with the method of ALARP (As Low As Reasonably Practicable) (Liu et al, 2011). Risk analysis aims to determine which types of risk, including the highest category value opportunities and risk exposures. Test reliability for each type of risk by computing the dispersion formula G. G can calculate the size of the value of consistency level agreements questionnaire answers from stakeholders. After classification, the risk rating can be done to reduce the impact of risk mitigation of risk. The results using data from 73 kinds of risks there are 5 types of risks including high risk categories that need to be responded to through the mitigation of risk.
format Theses
author NURHAYATI (NIM : 23411067); Pembimbing : Dr. Ir. Budhi Prihartono, DEA, AI
spellingShingle NURHAYATI (NIM : 23411067); Pembimbing : Dr. Ir. Budhi Prihartono, DEA, AI
#TITLE_ALTERNATIVE#
author_facet NURHAYATI (NIM : 23411067); Pembimbing : Dr. Ir. Budhi Prihartono, DEA, AI
author_sort NURHAYATI (NIM : 23411067); Pembimbing : Dr. Ir. Budhi Prihartono, DEA, AI
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/14756
_version_ 1820737302020751360