#TITLE_ALTERNATIVE#
The construction industry has a high risk factor because of frequent delays in project completion which adds to costs. Risk analysis has not been applied properly on some contractors. Therefore it is necessary to do research on the identification and analysis of risks in the implementation of constr...
Saved in:
Main Author: | NURHAYATI (NIM : 23411067); Pembimbing : Dr. Ir. Budhi Prihartono, DEA, AI |
---|---|
Format: | Theses |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14756 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
#TITLE_ALTERNATIVE#
by: AJI BRATA (NIM : 13403012); Pembimbing : Dr. Ir. Budhi Prihartono, DEA, WINDRI -
#TITLE_ALTERNATIVE#
by: (NIM 19007087); Pembimbing: Dr. Ir. Budhi Arta Surya, MSc., RADHIYAN -
#TITLE_ALTERNATIVE#
by: ULTRA SJAHBUNAN (NIM : 19009091); Pembimbing : Dr. Ir. Budhi Arta Surya, MSc, ADAM -
#TITLE_ALTERNATIVE#
by: PRADANASMARA PUTRA (NIM 10105078); Pembimbing: Dr. Wono Setya Budhi, YOSSY -
#TITLE_ALTERNATIVE#
by: ADHYA NIRWANA (NIM 10107055); Pembimbing : Dr. M. Wono Setya Budhi, KRISHA