DESIGN OF BABAKAN WASTE TO ENERGY PLANT
Waste become a problem that need special attention and handling in Bandung district. Their handling with open dumping method is not relevant anymore and give many problems. Waste to energy plant can be an alternative way to solve waste problem in Bandung district. Waste to energy plant consist of an...
Saved in:
Main Author: | ANDREAS WISNU PERDANA (NIM : 13105140); Pembimbing : Dr. Ir. Ari Darmawan Pasek |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14881 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
ANALYSIS OF BANDUNG MSW COMBUSTION CHARACTERISTIC FOR WASTE TO ENERGY FACILITIES IN BABAKAN
by: PRAKASA (NIM : 13104073); Pembimbing : Dr. Ir. Ari Darmawan Pasek, YANDA -
IDENTIFICATION OF BACTERIA IN GROUND WATER AROUND WASTE DISPOSAL SITE (CASE STUDY: BABAKAN WASTE DISPOSAL SITE)
by: CALSEN SASTRA (NIM 15303038); Pembimbing: Ir. Indah Rachmatilah Siti Salami, M.Sc., Ph.D., RAYMOND -
POWER PLANT CAPACITY DETERMINATION & FUNDAMENTALS DESIGN FOR KOTABARU REGION SOUTH BORNEO PROVINCE
by: (NIM : 13104004); Pembimbing Dr. Ir. Ari Darmawan Pasek, RIFANDI -
POWER PLANT CAPACITY DETERMINATION AND FUNDAMENTALS DESIGN FOR KOTABARU REGION SOUTH BORNEO PROVINCE
by: (NIM : 13104004); Pembimbing Dr. Ir. Ari Darmawan Pasek, RIFANDI -
ANALYSIS AND OPTIMATION OF COOLING TOWER GEOTHERMAL POWER PLANT UNIT 4 CASE STUDY PT. PERTAMINA GEOTHERMAL ENERGY KAMOJANG AREA
by: ABIMOTO (NIM : 13107043); Pembimbing Utama : Dr. Ir. Ari Darmawan Pasek, AZFAR