ANALYSIS AND OPTIMATION OF COOLING TOWER GEOTHERMAL POWER PLANT UNIT 4 CASE STUDY PT. PERTAMINA GEOTHERMAL ENERGY KAMOJANG AREA
PT. Pertamina Geothermal Energy (PGE) is one of the multinational company that operates in renewable energy sector. Based on one of the ongoing program called CIP (Continuous Improving Program), PT. Pertamina is planning to optimize all of the system and performance in the power plant. One of the ma...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/15108 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |