MODIFICATION OF KAMOJANG UNIT 2 GEOTHERMAL POWER PLANT USING COMBINED CYCLE

Geothermal energy source in Indonesia is very large, reaching 27 GW. If this energy can be maximized, it can fulfill national electricity demand in the future. One of the geothermal power plant in Indonesia is Kamojang Unit 2 <br /> <br /> <br /> Geothermal Power Plant which is m...

Full description

Saved in:
Bibliographic Details
Main Author: AZMI GHAFERY (NIM : 13106086); Pembimbing : Prof. Dr. T. A. Fauzi Soelaiman, MSME, GENISA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/15763
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia