MODIFICATION OF KAMOJANG UNIT 2 GEOTHERMAL POWER PLANT USING COMBINED CYCLE

Geothermal energy source in Indonesia is very large, reaching 27 GW. If this energy can be maximized, it can fulfill national electricity demand in the future. One of the geothermal power plant in Indonesia is Kamojang Unit 2 <br /> <br /> <br /> Geothermal Power Plant which is m...

Full description

Saved in:
Bibliographic Details
Main Author: AZMI GHAFERY (NIM : 13106086); Pembimbing : Prof. Dr. T. A. Fauzi Soelaiman, MSME, GENISA
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/15763
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:15763
spelling id-itb.:157632017-09-27T10:40:53ZMODIFICATION OF KAMOJANG UNIT 2 GEOTHERMAL POWER PLANT USING COMBINED CYCLE AZMI GHAFERY (NIM : 13106086); Pembimbing : Prof. Dr. T. A. Fauzi Soelaiman, MSME, GENISA Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/15763 Geothermal energy source in Indonesia is very large, reaching 27 GW. If this energy can be maximized, it can fulfill national electricity demand in the future. One of the geothermal power plant in Indonesia is Kamojang Unit 2 <br /> <br /> <br /> Geothermal Power Plant which is managed by PT. Indonesia Power. This geothermal power plant uses direct dry steam cycle and can produce 55000 kW generator power or 52538 kW total net power. In this final project, the plant system is modified using a combined cycle, which combine the dry steam cycle with binary cycle. <br /> <br /> <br /> In the first modification, condensing turbine is replaced by back pressure turbine, and the steam output is used to heat the binary fluid. In the first modification, the total net power that can be generated is 49481 kW, smaller than the power of existing geothermal power plant. In the second modification, steam output from back pressure turbine is separated on the separator, saturated steam turbine used to drive condensing turbine and the hot water is used to heat <br /> <br /> <br /> binary fluid. Total net power that can be generated is 53011 kW, larger than the existing geothermal power plant. In this second modification, it was also analyzed if the system does not use a binary cycle. This system without binary cycle can generate 52947 kW total net power, larger than the existing condition but smaller than the second system with a binary cycle. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Geothermal energy source in Indonesia is very large, reaching 27 GW. If this energy can be maximized, it can fulfill national electricity demand in the future. One of the geothermal power plant in Indonesia is Kamojang Unit 2 <br /> <br /> <br /> Geothermal Power Plant which is managed by PT. Indonesia Power. This geothermal power plant uses direct dry steam cycle and can produce 55000 kW generator power or 52538 kW total net power. In this final project, the plant system is modified using a combined cycle, which combine the dry steam cycle with binary cycle. <br /> <br /> <br /> In the first modification, condensing turbine is replaced by back pressure turbine, and the steam output is used to heat the binary fluid. In the first modification, the total net power that can be generated is 49481 kW, smaller than the power of existing geothermal power plant. In the second modification, steam output from back pressure turbine is separated on the separator, saturated steam turbine used to drive condensing turbine and the hot water is used to heat <br /> <br /> <br /> binary fluid. Total net power that can be generated is 53011 kW, larger than the existing geothermal power plant. In this second modification, it was also analyzed if the system does not use a binary cycle. This system without binary cycle can generate 52947 kW total net power, larger than the existing condition but smaller than the second system with a binary cycle.
format Final Project
author AZMI GHAFERY (NIM : 13106086); Pembimbing : Prof. Dr. T. A. Fauzi Soelaiman, MSME, GENISA
spellingShingle AZMI GHAFERY (NIM : 13106086); Pembimbing : Prof. Dr. T. A. Fauzi Soelaiman, MSME, GENISA
MODIFICATION OF KAMOJANG UNIT 2 GEOTHERMAL POWER PLANT USING COMBINED CYCLE
author_facet AZMI GHAFERY (NIM : 13106086); Pembimbing : Prof. Dr. T. A. Fauzi Soelaiman, MSME, GENISA
author_sort AZMI GHAFERY (NIM : 13106086); Pembimbing : Prof. Dr. T. A. Fauzi Soelaiman, MSME, GENISA
title MODIFICATION OF KAMOJANG UNIT 2 GEOTHERMAL POWER PLANT USING COMBINED CYCLE
title_short MODIFICATION OF KAMOJANG UNIT 2 GEOTHERMAL POWER PLANT USING COMBINED CYCLE
title_full MODIFICATION OF KAMOJANG UNIT 2 GEOTHERMAL POWER PLANT USING COMBINED CYCLE
title_fullStr MODIFICATION OF KAMOJANG UNIT 2 GEOTHERMAL POWER PLANT USING COMBINED CYCLE
title_full_unstemmed MODIFICATION OF KAMOJANG UNIT 2 GEOTHERMAL POWER PLANT USING COMBINED CYCLE
title_sort modification of kamojang unit 2 geothermal power plant using combined cycle
url https://digilib.itb.ac.id/gdl/view/15763
_version_ 1820737542025117696