DESIGN OF GEOTHERMAL POWER PLANT UTILIZING EXCEES STEAM CASE STUDY PT INDONESIA POWER UBP KAMOJANG
Geothermal energy development can be done not only using existing geothermal wells but also optimizing existing geothermal power plants. Geothermal power plants existing in Kamojang among others are units 1, 2, and 3 owned by PT Indonesia Power. Nowadays, it is calculated that there is excess hot st...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/17052 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |