DESIGN OF GEOTHERMAL POWER PLANT UTILIZING EXCEES STEAM CASE STUDY PT INDONESIA POWER UBP KAMOJANG
Geothermal energy development can be done not only using existing geothermal wells but also optimizing existing geothermal power plants. Geothermal power plants existing in Kamojang among others are units 1, 2, and 3 owned by PT Indonesia Power. Nowadays, it is calculated that there is excess hot st...
Saved in:
Main Author: | MOCHAMAD IQBAL (NIM : 131 06 114); Pembimbing : Prof. Dr. Ir. T.A. Fauzi Soelaiman, MSME, RIZA |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/17052 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
GAS REMOVAL SYSTEM OPTIMIZATION IN KAMOJANG UNIT 2 GEOTHERMAL POWER PLANT
by: KRISNA DANA PUTRA (NIM : 131 06 097); Pembimbing : Prof. Dr. Ir. T.A. Fauzi Soelaiman, MSME, ARIEF -
MODIFICATION OF KAMOJANG UNIT 2 GEOTHERMAL POWER PLANT USING COMBINED CYCLE
by: AZMI GHAFERY (NIM : 13106086); Pembimbing : Prof. Dr. T. A. Fauzi Soelaiman, MSME, GENISA -
THERMODYNAMICS ANALYSIS OF DOUBLE FLASH CYCLE AT THE WAYANG WINDU UNIT 1 GEOTHERMAL POWER PLANT
by: WIRAWAN (NIM : 131 06 042); Dosen Pembimbing : Prof. Dr. Ir. T.A. Fauzi Soelaiman, MSME , IRWAN -
REDESIGN PT. INDONESIA POWER UBP KAMOJANG PERFORMANCE MEASUREMENT SYSTEM BASED ON PERFORMANCE PRISM
by: Syafarianto (NIM 291 04 327), Arief -
INITIAL DEVELOPMENT OF WEB BASED APLICATION SOFTWARE FOR INFORMATION SYSTEM AND SIMULATION OF KAMOJANG GEOTHERMAL POWER PLANT PT INDONESIA POWER
by: KARYADI (NIM : 131 04 098); Pembimbing Utama : Dr. Ir. Yatna Yuwana M. ; Pembimbing Pendamping, ARIES