GAS REMOVAL SYSTEM OPTIMIZATION IN KAMOJANG UNIT 2 GEOTHERMAL POWER PLANT

Kamojang Unit 2 Geothermal Power Plant is one of the geothermal power plants owned by PT. Indonesia Power with a capacity of 55 MW. As the gas removal system (GRS) it uses ejector two levels. Steam consumption required for the GRS is the reason to optimize on the GRS. <br /> <br /> <...