GAS REMOVAL SYSTEM OPTIMIZATION IN KAMOJANG UNIT 2 GEOTHERMAL POWER PLANT
Kamojang Unit 2 Geothermal Power Plant is one of the geothermal power plants owned by PT. Indonesia Power with a capacity of 55 MW. As the gas removal system (GRS) it uses ejector two levels. Steam consumption required for the GRS is the reason to optimize on the GRS. <br /> <br /> <...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14995 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |