STUDY ON THE MODIFICATION OF CONDENSER AND COOLING TOWER SYSTEM TO INCREASE TURBINE POWER OF GEOTHERMAL POWER PLANT
PLTP Kamojang is one of power plants in Indonesia that utilizes geothermal energy. PLTP Kamojang consists of 3 units with a generated power is 30 MW for Unit 1 and each of 55 MW for Unit 2 and 3. To optimize the geothermal energy, then we do redesign the system used. <br /> <br /> <...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14696 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |