PLTP Kamojang is one of power plants in Indonesia that utilizes geothermal energy. PLTP Kamojang consists of 3 units with a generated power is 30 MW for Unit 1 and each of 55 MW for Unit 2 and 3. To optimize the geothermal energy, then we do redesign the system used. <br /> <br /> <...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14696 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
id |
id-itb.:14696 |
---|---|
spelling |
id-itb.:146962017-09-27T10:40:59ZSTUDY ON THE MODIFICATION OF CONDENSER AND COOLING TOWER SYSTEM TO INCREASE TURBINE POWER OF GEOTHERMAL POWER PLANT ASMORO BAHAR (NIM : 131 06 019); Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, AGUNG Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/14696 PLTP Kamojang is one of power plants in Indonesia that utilizes geothermal energy. PLTP Kamojang consists of 3 units with a generated power is 30 MW for Unit 1 and each of 55 MW for Unit 2 and 3. To optimize the geothermal energy, then we do redesign the system used. <br /> <br /> <br /> To increase the power generated, then designed a system that can lower the condenser pressure. Condenser pressure of 0.1 bar absolute initially decreased to 0.079 bar absolute. To achieve these conditions is done by adding the <br /> <br /> <br /> rate of cooling water to condense the steam. The rate of cooling water required is 3200 kg/s, which is channeled through two parallel pipes. In addition, the gas extraction system is also designed to support the changes of condenser pressure. <br /> <br /> <br /> In the wet bulb temperature environments ranging from 12oC -29oC has done an analysis of the power generated by the system. The result shows that with this system redesign, the generators power of PLTP Kamojang Unit 2 can be increased up to 1.25 MW. In addition, the gas extraction system is also simulated. <br /> <br /> <br /> Gas extraction system is used to attract the non-condensable gases from the condenser so that the condenser pressure is not increased. The results showed that the gas extraction system designed can be used to attract the non-condensable gas. text |
institution |
Institut Teknologi Bandung |
building |
Institut Teknologi Bandung Library |
continent |
Asia |
country |
Indonesia Indonesia |
content_provider |
Institut Teknologi Bandung |
collection |
Digital ITB |
language |
Indonesia |
description |
PLTP Kamojang is one of power plants in Indonesia that utilizes geothermal energy. PLTP Kamojang consists of 3 units with a generated power is 30 MW for Unit 1 and each of 55 MW for Unit 2 and 3. To optimize the geothermal energy, then we do redesign the system used. <br />
<br />
<br />
To increase the power generated, then designed a system that can lower the condenser pressure. Condenser pressure of 0.1 bar absolute initially decreased to 0.079 bar absolute. To achieve these conditions is done by adding the <br />
<br />
<br />
rate of cooling water to condense the steam. The rate of cooling water required is 3200 kg/s, which is channeled through two parallel pipes. In addition, the gas extraction system is also designed to support the changes of condenser pressure. <br />
<br />
<br />
In the wet bulb temperature environments ranging from 12oC -29oC has done an analysis of the power generated by the system. The result shows that with this system redesign, the generators power of PLTP Kamojang Unit 2 can be increased up to 1.25 MW. In addition, the gas extraction system is also simulated. <br />
<br />
<br />
Gas extraction system is used to attract the non-condensable gases from the condenser so that the condenser pressure is not increased. The results showed that the gas extraction system designed can be used to attract the non-condensable gas. |
format |
Final Project |
author |
ASMORO BAHAR (NIM : 131 06 019); Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, AGUNG |
spellingShingle |
ASMORO BAHAR (NIM : 131 06 019); Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, AGUNG STUDY ON THE MODIFICATION OF CONDENSER AND COOLING TOWER SYSTEM TO INCREASE TURBINE POWER OF GEOTHERMAL POWER PLANT |
author_facet |
ASMORO BAHAR (NIM : 131 06 019); Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, AGUNG |
author_sort |
ASMORO BAHAR (NIM : 131 06 019); Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, AGUNG |
title |
STUDY ON THE MODIFICATION OF CONDENSER AND COOLING TOWER SYSTEM TO INCREASE TURBINE POWER OF GEOTHERMAL POWER PLANT |
title_short |
STUDY ON THE MODIFICATION OF CONDENSER AND COOLING TOWER SYSTEM TO INCREASE TURBINE POWER OF GEOTHERMAL POWER PLANT |
title_full |
STUDY ON THE MODIFICATION OF CONDENSER AND COOLING TOWER SYSTEM TO INCREASE TURBINE POWER OF GEOTHERMAL POWER PLANT |
title_fullStr |
STUDY ON THE MODIFICATION OF CONDENSER AND COOLING TOWER SYSTEM TO INCREASE TURBINE POWER OF GEOTHERMAL POWER PLANT |
title_full_unstemmed |
STUDY ON THE MODIFICATION OF CONDENSER AND COOLING TOWER SYSTEM TO INCREASE TURBINE POWER OF GEOTHERMAL POWER PLANT |
title_sort |
study on the modification of condenser and cooling tower system to increase turbine power of geothermal power plant |
url |
https://digilib.itb.ac.id/gdl/view/14696 |
_version_ |
1820737290309206016 |