STUDY ON THE MODIFICATION OF CONDENSER AND COOLING TOWER SYSTEM TO INCREASE TURBINE POWER OF GEOTHERMAL POWER PLANT

PLTP Kamojang is one of power plants in Indonesia that utilizes geothermal energy. PLTP Kamojang consists of 3 units with a generated power is 30 MW for Unit 1 and each of 55 MW for Unit 2 and 3. To optimize the geothermal energy, then we do redesign the system used. <br /> <br /> <...

Full description

Saved in:
Bibliographic Details
Main Author: ASMORO BAHAR (NIM : 131 06 019); Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, AGUNG
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/14696
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:14696
spelling id-itb.:146962017-09-27T10:40:59ZSTUDY ON THE MODIFICATION OF CONDENSER AND COOLING TOWER SYSTEM TO INCREASE TURBINE POWER OF GEOTHERMAL POWER PLANT ASMORO BAHAR (NIM : 131 06 019); Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, AGUNG Indonesia Final Project INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/14696 PLTP Kamojang is one of power plants in Indonesia that utilizes geothermal energy. PLTP Kamojang consists of 3 units with a generated power is 30 MW for Unit 1 and each of 55 MW for Unit 2 and 3. To optimize the geothermal energy, then we do redesign the system used. <br /> <br /> <br /> To increase the power generated, then designed a system that can lower the condenser pressure. Condenser pressure of 0.1 bar absolute initially decreased to 0.079 bar absolute. To achieve these conditions is done by adding the <br /> <br /> <br /> rate of cooling water to condense the steam. The rate of cooling water required is 3200 kg/s, which is channeled through two parallel pipes. In addition, the gas extraction system is also designed to support the changes of condenser pressure. <br /> <br /> <br /> In the wet bulb temperature environments ranging from 12oC -29oC has done an analysis of the power generated by the system. The result shows that with this system redesign, the generators power of PLTP Kamojang Unit 2 can be increased up to 1.25 MW. In addition, the gas extraction system is also simulated. <br /> <br /> <br /> Gas extraction system is used to attract the non-condensable gases from the condenser so that the condenser pressure is not increased. The results showed that the gas extraction system designed can be used to attract the non-condensable gas. text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description PLTP Kamojang is one of power plants in Indonesia that utilizes geothermal energy. PLTP Kamojang consists of 3 units with a generated power is 30 MW for Unit 1 and each of 55 MW for Unit 2 and 3. To optimize the geothermal energy, then we do redesign the system used. <br /> <br /> <br /> To increase the power generated, then designed a system that can lower the condenser pressure. Condenser pressure of 0.1 bar absolute initially decreased to 0.079 bar absolute. To achieve these conditions is done by adding the <br /> <br /> <br /> rate of cooling water to condense the steam. The rate of cooling water required is 3200 kg/s, which is channeled through two parallel pipes. In addition, the gas extraction system is also designed to support the changes of condenser pressure. <br /> <br /> <br /> In the wet bulb temperature environments ranging from 12oC -29oC has done an analysis of the power generated by the system. The result shows that with this system redesign, the generators power of PLTP Kamojang Unit 2 can be increased up to 1.25 MW. In addition, the gas extraction system is also simulated. <br /> <br /> <br /> Gas extraction system is used to attract the non-condensable gases from the condenser so that the condenser pressure is not increased. The results showed that the gas extraction system designed can be used to attract the non-condensable gas.
format Final Project
author ASMORO BAHAR (NIM : 131 06 019); Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, AGUNG
spellingShingle ASMORO BAHAR (NIM : 131 06 019); Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, AGUNG
STUDY ON THE MODIFICATION OF CONDENSER AND COOLING TOWER SYSTEM TO INCREASE TURBINE POWER OF GEOTHERMAL POWER PLANT
author_facet ASMORO BAHAR (NIM : 131 06 019); Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, AGUNG
author_sort ASMORO BAHAR (NIM : 131 06 019); Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, AGUNG
title STUDY ON THE MODIFICATION OF CONDENSER AND COOLING TOWER SYSTEM TO INCREASE TURBINE POWER OF GEOTHERMAL POWER PLANT
title_short STUDY ON THE MODIFICATION OF CONDENSER AND COOLING TOWER SYSTEM TO INCREASE TURBINE POWER OF GEOTHERMAL POWER PLANT
title_full STUDY ON THE MODIFICATION OF CONDENSER AND COOLING TOWER SYSTEM TO INCREASE TURBINE POWER OF GEOTHERMAL POWER PLANT
title_fullStr STUDY ON THE MODIFICATION OF CONDENSER AND COOLING TOWER SYSTEM TO INCREASE TURBINE POWER OF GEOTHERMAL POWER PLANT
title_full_unstemmed STUDY ON THE MODIFICATION OF CONDENSER AND COOLING TOWER SYSTEM TO INCREASE TURBINE POWER OF GEOTHERMAL POWER PLANT
title_sort study on the modification of condenser and cooling tower system to increase turbine power of geothermal power plant
url https://digilib.itb.ac.id/gdl/view/14696
_version_ 1820737290309206016