STUDY ON THE MODIFICATION OF CONDENSER AND COOLING TOWER SYSTEM TO INCREASE TURBINE POWER OF GEOTHERMAL POWER PLANT
PLTP Kamojang is one of power plants in Indonesia that utilizes geothermal energy. PLTP Kamojang consists of 3 units with a generated power is 30 MW for Unit 1 and each of 55 MW for Unit 2 and 3. To optimize the geothermal energy, then we do redesign the system used. <br /> <br /> <...
Saved in:
Main Author: | ASMORO BAHAR (NIM : 131 06 019); Pembimbing : Dr. Ir. Prihadi Setyo Darmanto, AGUNG |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/14696 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
IMPLEMENTATION OF RCM METHOD ON THE MAINTENANCE OF COOLING TOWER, CONDENSER AND CONDENSATE PUMP AT PLTGU BEKASI POWER
by: WAHYUDHI (NIM : 13106035); Pembimbing 1 : Dr. Ir Sangriyadi Setio; Pembimbing 2 : Prof. Dr. I, RYAN -
ANALYSIS AND OPTIMATION OF COOLING TOWER GEOTHERMAL POWER PLANT UNIT 4 CASE STUDY PT. PERTAMINA GEOTHERMAL ENERGY KAMOJANG AREA
by: ABIMOTO (NIM : 13107043); Pembimbing Utama : Dr. Ir. Ari Darmawan Pasek, AZFAR -
DESIGN, CONSTRUCTION, AND TESTS OF TESLA TURBINE PROTOTYPE AS A TURBINE OF TOTAL FLOW SYSTEM IN GEOTHERMAL POWER PLANT
by: ADI PRANANTO (NIM : 131 06 030); Dosen Pembimbing : Prof. Dr. Ir. T.A. Fauzi Soelaiman, MSM, LUKMAN -
ii DISPERSION ANALYSIS OF THE WATER VAPOR EMISSION OF GEOTHERMAL ENERGY POWER PLANTS USING CALPUFF (Case Study PT Pertamina Geothermal Energi Lapangan Kamojang Cooling tower)
by: RIFKI MUKTI (NIM :12809027);Pembimbing :Drs. Zadrach L. Dupe, M.Sc , BRAMUDYA -
DESIGN OF ROTARY COOLER FOR COOLING NICKEL SLAG
by: (NIM : 131 06 037); Pembimbing: Dr. Ir. Prihadi Setyo Darmanto, NASRI