MODIFICATION OF KAMOJANG UNIT 2 GEOTHERMAL POWER PLANT USING COMBINED CYCLE
Geothermal energy source in Indonesia is very large, reaching 27 GW. If this energy can be maximized, it can fulfill national electricity demand in the future. One of the geothermal power plant in Indonesia is Kamojang Unit 2 <br /> <br /> <br /> Geothermal Power Plant which is m...
Saved in:
Main Author: | AZMI GHAFERY (NIM : 13106086); Pembimbing : Prof. Dr. T. A. Fauzi Soelaiman, MSME, GENISA |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/15763 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
GAS REMOVAL SYSTEM OPTIMIZATION IN KAMOJANG UNIT 2 GEOTHERMAL POWER PLANT
by: KRISNA DANA PUTRA (NIM : 131 06 097); Pembimbing : Prof. Dr. Ir. T.A. Fauzi Soelaiman, MSME, ARIEF -
DESIGN OF GEOTHERMAL POWER PLANT UTILIZING EXCEES STEAM CASE STUDY PT INDONESIA POWER UBP KAMOJANG
by: MOCHAMAD IQBAL (NIM : 131 06 114); Pembimbing : Prof. Dr. Ir. T.A. Fauzi Soelaiman, MSME, RIZA -
THERMODYNAMIC STUDY OF DIRECT CONTACT CONDENSER IN UNIT 4 KAMOJANG GEOTHERMAL POWER PLANT
by: FARDIAS MU’MIN (NIM : 13107030); Pembimbing Utama : Dr. Ir. Ari Darmawan Pasek, GEA -
THERMODYNAMICS ANALYSIS OF DOUBLE FLASH CYCLE AT THE WAYANG WINDU UNIT 1 GEOTHERMAL POWER PLANT
by: WIRAWAN (NIM : 131 06 042); Dosen Pembimbing : Prof. Dr. Ir. T.A. Fauzi Soelaiman, MSME , IRWAN -
ANALYSIS AND OPTIMATION OF COOLING TOWER GEOTHERMAL POWER PLANT UNIT 4 CASE STUDY PT. PERTAMINA GEOTHERMAL ENERGY KAMOJANG AREA
by: ABIMOTO (NIM : 13107043); Pembimbing Utama : Dr. Ir. Ari Darmawan Pasek, AZFAR