DIMENSION DETERMINATION AND STRESS ANALYSIS OF PIPING SYSTEM IN WELL PAD 29 DIENG UNIT I GEOTHERMAL PRODUCTION FACILITY
Geothermal is one of alternative energy that very potensial in Indonesia. Up to 40% of geothermal energy in this world is located in Indonesia. 27357,5 Mwe geothermal energy that can be produced in Indonesia, but the fact that Indonesia just only used 1052 Mwe until 2008. Geothermal energy productio...
Saved in:
Main Author: | BHAKTI ARIFMAN , ANDY |
---|---|
Format: | Final Project |
Language: | Indonesia |
Subjects: | |
Online Access: | https://digilib.itb.ac.id/gdl/view/14902 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |
Similar Items
-
DESIGN OF PIPING SYSTEM IN CLUSTER 24 LAHENDONG UNIT IV GEOTHERMAL PRODUCTION FACILITY
by: JOVAN VIVALDIZ , BOB -
THE EFFECT OF FRACTURE INTENSITY DISTRIBUTION ON PRODUCTIVITY AND FLOWING PRESSURE DISTRIBUTION ALONG THE HORIZONTAL WELLS
by: Ibrahim , Malik -
EVALUATION OF THE COMBINATION OF FRACTURING AND GRAVEL PACKING (FRAC&PACK) JOBS FOR HIGH PERMEABILITY AND SOFT SAND STONE FORMATION WELL COMPLETION: DURI STEAM FLOOD FIELD CASE
by: Aimar, Amritzar -
PENGARUH PENGAKU BAJA TERHADAP PERILAKU STRUKTUR PORTAL BETON BERTULANG
by: Adrian, Feddy -
PERANCANGAN DAN IMPLEMENTASI SISTEM TERSEBAR PANDUAN MISSILE DENGAN JAVA RMI
by: Bahtiar, Arief